Construction Plan and time line for The Manufacturing Facilities

  • Gangneung Science and Industrial Complex in Gangwon-do (810-2, Bandong-ri, Sacheon-myeon, Gangneung-si)

    1st Plant: Dedicated for Insulin, Insulin Analogs, and other Biosimilars (mAbs)

    Insulin, Insulin Glargine, Insulin Lispro, Adalimumab, Bevacizumab

    Area

    Land 21325.6

    Construction Completion Schedule09 / 2023

  • Gangneung Science and Industrial Complex in Gangwon-do(808-17, Bandong-ri, Sacheon-myeon, Gangneung-si)

    2nd Plant: Dedicated for Injectable drugs

    General Injectables (Liquid; SVP, LVP, Lyophilized)

    Area

    Land 30712.9
    Building 11848.38

    Construction Completion Schedule12 / 2023

  • TBD

    Future Plan: Manufacturing factory Dedicated for anti-cancer drugs

    Oral Solid Dosage, Injectables (Liquid and Lyophilized)

    Area

    Land -
    Building -

    Construction Completion Schedule / TBD